Cairo-Alex Desert Road to be finished before Summer 2015 – Authority

Egyptian Armed Forces’ Engineering Authority is set to finish developing Egypt-Alex desert road before the beginning of this summer, the head of the authority Kamel al-Wazeer said on Saturday.

Al-Wazeer added that those works aim at ending traffic suffocation in line with previous development works accomplished on some areas in Egypt-Alex desert road starting from Carrefour to the toll gate.

The Egyptian army official made his remarks on Saturday during checking the road development site with Giza governor Khaled Zakaria El Adly.

Moreover, al-Wazeer added that Armed Forces’ Engineering Authority currently works on upgrading the road from 26th of July Corridor to El-Remaya-Square and increasing the road lanes to 4 in each direction.

Leave a comment